In May 2019 Element Six installed #2 M2G Advanced Boiler Control Units to maximise efficiencies a their Shannon site

Installing M2G will also ensure that Co2 emissions are kept to an absolute minimum

The installation was completed in one day without any downtime on the boilers

Element Six use synthetic diamond and tungsten carbide to provide tools and technology to many industries world wide

M2G On Oil Boiler at Element Six Shannon

Element Six