GEM Install M2G for JP Morgan Chase Bank

GEM Installed M1G and M2G advanced boiler controls with interface units for JP Morgan Chase Bank in Dublin This installation in the IFSC for JP Morgan Chase was completed in 2 working days during normal hours without any impact on the heating or hot water supply to...

M2G Savings Tower Above

GEM installed #2 M2G boiler load control with interfacing to #2 Rendamax modulating boilers at the Tower Hotel Waterford in Nov 2017 and delivered 15.79% gas savings to IPMVP. This project was supported by Bord Gais and delivered a calculated 5 year net profit of...

National Opera House Sing M2G Praises

https://www.nationaloperahouse.ie/ National Opera House Wexford opt to install #2 M2G This was a seamless installation with no interruption to services at the National Opera House and involved the installation of #2 M2G on-boiler load controls to inhibit boiler...

Powerscourt Resort poised for savings with M2G

GEM has deployed #3 M2G at the Powerscourt Resort Wicklow The project was fully funded through the EEOS and GEM’s Energy Partner Company The #3 oil fired boilers at Powerscourt supply all the heating and hot water to this 5 Star Resort. Powerscourt was recently...

Castlemartyr cruise with M2G

#5 M2G units were installed at Castlemartyr Resort in Cork in January 2018 The #5 1Mw boilers service the heating and hot water requirements for this 5 star resort which is the recepient of Tripadvisors ‘Travellers Choice’ and ‘Certificate of...

M2G Installation for Defence Forces Cathal Brugha

A number of M2G were installed at Cathal Brugha Barracks during December 2017. The buildings are monitored through the DF ResourceKraft energy analyitics software which allows daily gas consumption to be calculated. Pre and post M2G performance analysis will be...