In May 2019 Element Six installed #2 M2G Advanced Boiler Control Units to maximise efficiencies a their Shannon site
Installing M2G will also ensure that Co2 emissions are kept to an absolute minimum
The installation was completed in one day without any downtime on the boilers
Element Six use synthetic diamond and tungsten carbide to provide tools and technology to many industries world wide
Element Six