https://www.nationaloperahouse.ie/

National Opera House Wexford opt to install #2 M2G

This was a seamless installation with no interruption to services at the National Opera House and involved the installation of #2 M2G on-boiler load controls to inhibit boiler nuisance cycling

The boilers at the NOH are oil fired with 2-stage dual thermosat control

All boiler operation is controlled by the BMS e.g. WC, Optimum Start, Sequencing and Timing

The M2G inhibit boiler nuisance cycling on the enabled boiler to ensure that it does not cycle under very low load conditions or to replenish its own heat loss within limits.