by GEM | Mar 24, 2020 | GEM News
Hot water boilers have operated as the heat centres of our buildings for years. Boiler control/optimisation is high on the list of uptake energy efficient technologies. THE PROBLEM: Quoted instantaneous and advertised combustion efficiencies (sometimes >100%) do...
by GEM | Jan 21, 2020 | GEM News
#3 M2G Advanced Boiler Load controls were installed for the Powerscourt Resort and Spa in Co. Wicklow in January 2018 This contract fell under the EEOS scheme and the work was fully sponsored by Bord Gais Analysis of the pre and post weather corrected consumption...
by GEM | Jan 21, 2020 | GEM News
Magellan Aviation, an aviation parts company based in Shannon Co Clare installed #1 M2G unit on their boiler in July 2019 The boiler was type De Dietrich C630 floor standing condensing boiler Generally speaking, these type of boilers have low water content, narrow...
by GEM | Jan 19, 2020 | GEM News
In May 2019 Element Six installed #2 M2G Advanced Boiler Control Units to maximise efficiencies a their Shannon site Installing M2G will also ensure that Co2 emissions are kept to an absolute minimum The installation was completed in one day without any downtime on...
by GEM | Jan 24, 2019 | GEM News
GEM has always taken temperature log files from the boilers when it installs its M2G Advanced Boiler Control (ABC). The temperature file gives minute by minute information on the flow and return water temperatures in and out of the boiler By charting and analysing...